Client:
Meticulously modelled for coordinated complexity
About the project
This multi-floor installation involved working across Levels 1, 3 and 8 as complete floorplates. As well as this, Integra carried out the refurbishment of all 16 toilet blocks in the building and the refurbishment of the reception. This Cat A project was an exposed fit out, with dropped plasterboard margins around the perimeter to conceal main services equipment including VAV units.
Prior to the commencement of works, these offices were tired and in need of a refresh to bring them up to the expectations of incoming tenants while maximising the return for the landlord.
The key challenge was in the design. A fully coordinated design, principally of the VAV ductwork with other services such as sprinklers and lighting, was vital to ensure all services would fit within the plasterboard bulkhead.
Got a project in mind?
Let’s chat about your current MEP challenges, without any obligation.
Solutions
Integra carried out detailed coordination designs and clash detection – critical to ensure all M&E equipment would fit and the resultant visual appearance would be as uncluttered as possible.
3D modelling was carried out, and mock-up areas were completed to enable the end client to sign off the intent. From here, Integra kept close supervision of all trades on site to ensure on-time delivery.
Services
+ Full design calculations and drawings
+ Sub-main distribution
+ Cable containment
+ Internal lighting
+ External lighting
+ Fire alarm and PA/VA
+ Sprinklers
+ Plumbing
+ Air conditioning
+ VAV ventilation
+ Lagging
+ BMS and lighting controls
+ Testing and commissioning

Metro Building
Hammersmith hotspot: Achieving a rugged and industrial workspace