Case study

Thomas More Square

Scroll to discover
Building information
Sector:
Cat A office space
Size:
38,000 sq ft

Client:
 
Duration
Location:
St Katharine's Docks, London

Meticulously modelled for coordinated complexity

About the project

This multi-floor installation involved working across Levels 1, 3 and 8 as complete floorplates. As well as this, Integra carried out the refurbishment of all 16 toilet blocks in the building and the refurbishment of the reception. This Cat A project was an exposed fit out, with dropped plasterboard margins around the perimeter to conceal main services equipment including VAV units.

Prior to the commencement of works, these offices were tired and in need of a refresh to bring them up to the expectations of incoming tenants while maximising the return for the landlord.

The key challenge was in the design. A fully coordinated design, principally of the VAV ductwork with other services such as sprinklers and lighting, was vital to ensure all services would fit within the plasterboard bulkhead.

Got a project in mind?

Let’s chat about your current MEP
challenges, without any obligation.

Solutions

Integra carried out detailed coordination designs and clash detection – critical to ensure all M&E equipment would fit and the resultant visual appearance would be as uncluttered as possible.

3D modelling was carried out, and mock-up areas were completed to enable the end client to sign off the intent. From here, Integra kept close supervision of all trades on site to ensure on-time delivery.

Services

+ Full design calculations and drawings
+ Sub-main distribution
+ Cable containment
+ Internal lighting
+ External lighting
+ Fire alarm and PA/VA
+ Sprinklers
+ Plumbing
+ Air conditioning
+ VAV ventilation
+ Lagging
+ BMS and lighting controls
+ Testing and commissioning

Featured case study

Metro Building

Hammersmith hotspot: Achieving a rugged and industrial workspace

Featured case study

Chapter House

Bringing a bold vision to life, backed by BREEAM.

Featured case study

Thomas More Square

Meticulously modelled for coordinated complexity

Featured case study

Parchment House

Smart simplicity: Designing and installing a plug-and-play London workspace

Featured case study

Farringdon Point

Creating a high-profile, open plan workspace in London's design district

Featured case study

LGC Laboratory

Coordinating MEP complexity for a leading laboratory space in Guildford

Featured case study

Uniqlo, Regent Street

Undertaking the mechanical fitout of a flagship retail space in the heart of the capital

Featured case study

The Francis Crick Institute

A leading laboratory fit for future discoveries

Featured case study

Number 1 West Smithfield

A blank canvas where modernity merges with the traditional

Featured case study

Legacy Wharf

Cat-A curveball: Residential to commercial in a matter of weeks

Featured case study

Metro Building

Hammersmith hotspot: Achieving a rugged and industrial workspace